Project Description | Contract Type | Duration (Months) |
---|---|---|
Operation and Maintenance of a 28 tpm Vanadium Pentoxide recovery plant from an industrial effluent stream in Newcastle. | Operate & Maintain | 72 |
Operational staffing and management of the 28,000 tpm metals from slag plant for a major Platinum Producer | Operational management | 78 |
Operations of a 100 000 ton per month Crushing and Screening Plant at New Vaal Colliery | Operate & Maintain | 12 |
Design, construct, and operations of a 40,000 tpm diamond DMS plant in Lesotho for a London listed company. | EPCM | 9 |
Client representative to design, procure, install and operate a modular fit for purpose 80tph Coal DMS washing plant for a London Listed client |
Reimbursable | 14 |
Operate and maintain a 125,000tpm coal DMS washing plant for a London listed client | O&M | 60 |
Feasibility review and cost engineering of 2 coal projects for an Australian listed client | Reimbursable | 4 |
Operations of a 5,000tpm coal crushing and screening plant at ASA Metals | BOOT | 36 |
Operate and maintain a mobile coal screening plant in Mpumalanga | O&M | 4 |
Operate and maintain a mobile coal crushing plant in Mpumalanga | O&M | 9 |
Operate and maintain a mobile coal screening plant in Mpumalanga | O&M | 3 |
Development of a 60,000tpa Ferromanganese allay mine and smelter project in Zambia with successful listing on the Australian Stock Exchange. |
Reimbursable | 16 |
Process Design of a Chrome Beneficiation Plant at ASA Metals. | EPCM | 14 |
Sampling of Uranium bearing evaporation ponds and storage dams at NECSA. | Reimbursable | 2 |
Design; Construct and Operation of a Uranium Leach Plant to treat the Uranium bearing material from NECSA | EPCM + O&M | 36 |
Design of a 1000 ton per month Copper metal Production Facility utilising revolutionary new Technology | EPCM | 12 |
Consulting on operations (including test work) and plant design for New Kleinfontein Gold Mine | Reimbursable | 8 |
Design of a 100,000 tpm Platinum Concentrator for Tailings Dump re-treatment | Reimbursable | 2 |
Design and 15% cost estimate for a 1.1 mtpm dump reclamation system and pumpstation for Konkola Copper mines. It included the mining methodology, mine planning, safety procedures, etc |
Lump sum | 3 |
Re-design, upgrade, and modifications to a second-hand 6 ton gold elution plant and smelthouse. Included commissioning | Lump sum | 3 |
Process design and modifications to an operational gold plant to allow processing of harder ores, as well as increasing throughput by 25%. Included the installation of a tertiary crusher, second mill, and 3 further leach tanks. |
Lump sum | 4 |
Process design and pilot plant design for a new, more cost-effective Titanium metal process. | At risk (partnership) |
4 |
Design, installation, and commissioning of a 120,000 tpm slime dam reclamation system and pumpstation | Lump sum | 4 |
Design and construction management for a 180,000 tpm slime dam reclamation system and pumpstation supplying two plants | Lump sum | 5 |
Due diligence on a Bankable Feasibility study on a 180,000 tpm gold plant for a Canadian listed mining company | Lump sum | 1.5 |
Feasibility study on the re-opening of a gold mine and gold plant, including test work. In partnership with companies with geological and mining expertise. |
Lump sum | 3 |
Due diligence on a West rand gold mining project for a London listed company | Lump sum | 2 |
Due diligence on a West Rand gold mining project for a local investment company | Lump sum | 3 |
Due diligence on a Bankable Feasibility study on a 100,000 tpm gold plant for a Canadian listed mining company | Lump sum | 1 |
Design and construction of a 28 tpm Vanadium Pentoxide recovery plant from an industrial effluent stream. | BOOT | 65 |
Design and construction of a 28 000 tpm metals from slag recovery plant for a major Platinum producer. | EPCM | 8 |
Additional Contract Experience Obtained By The Team
Project Description | Contract Type | Duration (Years) |
---|---|---|
900,000 tpa HM coal washing plant (export and local product) | O&M | 6 |
150,000 tpa gold plant, from crushing to tailings deposition. (Inc. refurb.) | BOOT | 4 |
2,100,000 tpa sand dump reclamation station (6 km pipeline to plant) | BOOT | 5 |
360,000 tpa dump reclamation and gold plant | BOOT | 6 |
800,000 tpa dump reclamation and gold plant | BOOT | 5 |
2,040,000 tpa sand dump reclamation and pumping station (two sites) | O&M | 1.5 |
900,000 tpa hard rock and 900,000 tpa dump reclamation platinum concentrator | O&M | 5 |
9,360,000 tpa heavy mineral dune reclamation, re-deposition, and rehabilitation. | BOOT | 8 |
192,000 tpa gold plant. (flotation and gravity) | O&M | 2 |
2,220,000 tpa sand and slime dump reclamation and treatment plant | O&M | 1 |